Works commenced on the 20th of January 2015
High containment kerbs were installed to try & prevent any HGV(s) mounting the pedestrian footpath. Along with this were some Luna rail & Posts installed on top of the high containment kerbs, both as a safety feature to the public and as an aesthetically pleasing piece of street furniture.
Bridge of Peace
Bridge of peace - Erection of barriers
Bridge of peace (Before)
Bridge of Peace (Finished)
Bridge of Peace (Finished)